WHOOPS! I mis-read re: changes to GCR 5.5.4D Station Equipment
Submitted by DA_FC on March 18, 2008 - 11:13pm.
Hi all,
In my last topic I attached a .PDF file that contained an error. I mis-read the February FasTrack and wrote that a change to the GCR that affects us would take place on 11/1/08. Actually that change has only been proposed. The change would eliminate 5.5.4D entirely. This section talks about the minimum equipment that should be located at an active corner station. The relevant text has been copied and attached in .PDF form to this topic. Near the top is an email address you can use to comment on the proposed change. If you contact them please post your thoughts to this topic so others can see/discuss it.
Thanks to Joe Pakovitz for pointing out my error.
Verne
| Attachment | Size |
|---|---|
| change 5-5-4-D.pdf | 13.22 KB |


